Pradhan Mantri Gram Sadak Yojana

Name of the Scheme : Pradhan Mantri Gram Sadak Yojana (referred to as PMGSY-I hereinafter)

Department – PWD (R&B)

Scheme for : implemented by the Govt.

Where to Apply : NA

When to Apply : NA

Details

With the objective of providing rural connectivity, the Government of India launched the Pradhan Mantri Gram Sadak Yojana (referred to as PMGSY-I hereinafter) on 25th December 2000 to provide all-weather access to eligible unconnected habitations with a population of up to 500(Census 2001) in plain area and 250 and above in Special category States(States of North East, Jammu, and Kashmir, Himachal Pradesh, Uttarakhand), Desert Area as identified by Desert Development Program and 88 selected Backward Districts as identified by the Ministry of Home Affairs/Planning Commission as a strategy for poverty alleviation.

As of 8th December 2021, a total of 6,80,040 km of road length has been constructed under various interventions of Pradhan Mantri Gram Sadak Yojana (PMGSY). The primary objective of PMGSY concerns building robust, all-weather roads in rural habitations and other core areas. Panchayati Rajs and elected local representatives decide which habitations to be selected. This scheme was centrally funded only up to 2015-16. Since then, the funds have been divided between the Centre and the State. For North Eastern and Himalayan States (Jammu & Kashmir, Uttarakhand, and Himachal Pradesh) 90% of a project is the Union Government funds, and 10% of this cost, is the State Government funds. For the Other States, the Union Government funds around 60% of a project while the remaining 40% is by State Government funds.

Benefits

The benefits of the Pradhan Mantri Gram Sadak Yojana (PMGSY) are –

1.  All-weather connection to the hamlets that are least or not connected.

2.  Overall Development of the country allows for easy movement of goods and vehicles.

3.  There are better employment opportunities for those from villages thanks to road connections.

Eligibility

1.  A region must be a habitation. It cannot be a hamlet or revenue village to be eligible for the Pradhan Mantri Gram Sadak Yojana (PMGSY).

2.  The Central Government describes habitation as a population cluster residing within an area that remains constant over time. Some of the local words used to describe a habitation are: Majras, Desam, Hamlets, Tolas, Dhanis

3.  The hamlet must have a higher population as per the 2001 Census to be eligible for road connection. The eligible habitations have a population of above 500 persons in plain areas and around 250 persons and above in hilly areas.

Does The Programme Provide Connectivity To Only Revenue Villages? Are Hamlets Eligible To Be Connected?

The spirit and objective of PMGSY-I was to provide good all-weather road connectivity to eligible unconnected habitations. The unit of this programme is a habitation and not a revenue village or a Panchayat. A habitation is a cluster of population, living in an area, the location of which does not change over time. Desam, Dhanis, Tolas, Majras, Hamlets, etc. are commonly used to describe habitations. The population, as recorded in the Census 2001, shall be the basis for determining the population size of the habitation. The population of all Habitations within a radius of 500 metre (1.5 km of path distance in case of Hills) may be clubbed together to determine the population size. In the blocks bordering international boundary in the hill States (as identified by the Ministry of Home Affairs), however, all habitations within a path distance of 10 km may be treated as a cluster for this purpose. This cluster approach would enable the provision of connectivity to a number of Habitations, particularly in Hill/ mountainous areas. A special dispensation has been allowed to Arunachal Pradesh under PMGSY by extending the Cluster approach to all International border districts in the State by clubbing population with the path distance of 10 km and treating as a Cluster.

How Are Habitations Selected For Coverage? Who Decides Which Habitations Will Be Covered In A Year?

Unconnected habitations are listed as per the priority (generally, habitations with a higher population, as per 2001 Census, would be connected first) and depending upon the funds likely to be made available for the State, the list of road works to be taken up under PMGSY-I will be finalized each year by the District Panchayat through a consultative process involving Panchayati Raj Institutions and elected representatives.

How Is Alignment Selected? Are Local Villagers Associated With This Process?

A simple, non-formal transect walk shall be organised by the Assistant Engineer at the time of preparation of DPRs to finalise the alignment. The Panchayat Pradhan, local patwari, the JE, Local Revenue and Forest officials, Women PRI members and representatives of Women Self Help Groups (SHGs) also participate in the transect walk to determine the most suitable alignment, sort out the issues of land availability and to moderate any adverse social and environmental impact, eliciting necessary community participation in the programme. After transect walk, the minutes should be placed and approved by the Grama Sabha.Local people including those likely to be affected by proposed alignment are also allowed to put forth their view in this process.

What Does All-Weather Connectivity Mean? Does It Mean Only Black- Topped Or Cement Concrete Roads?

An all-weather road is one that is negotiable in all seasons of the year. This implies that the road-bed is drained effectively but this does not necessarily imply that it should be paved surface with blacktopping or cement concrete. A gravel road can also be an all-weather road.

How Is The Problem Of Drainage Tackled In The Portion Of Roads Passing Through Built-Up Residential Areas?

Road portions passing through built-up residential areas are prone to damages caused by wastewater from households. Programme guidelines provide for the construction of cement concrete pavement or cement/stone block pavements along with covered or uncovered Pucca side drains as per site conditions.

Is The Adequate Provision For Culverts Or Cross-Drainage Works Made?

The objective of the PMGSY is to provide an All-weather Road with necessary culverts and other cross drainage structures, which is operable throughout the year to the eligible unconnected habitations as per PMGSY guidelines in the rural areas. Rural roads constructed under PMGSY must have proper embankment and drainage. Adequate number and type of Cross Drainage (CD) works, including causeways, where appropriate, must be provided based on site requirements ascertained through necessary investigation. Minor bridges can be provided wherever necessary. A necessary advisory has been already issued to the State Governments to include the culverts/CDs bridges along with the road proposals. The proposal of long-span Bridges should be prepared as a separate DPR. However, such proposals of Bridges should be submitted with road proposals in the same batch.

What About Bridges On Rivers/Streams?

Bridges on rivers/streams crossing the alignment of the road are taken up under the program along with the road proposal. The Ministry issued PMGSY-III guidelines increasing the span of Long-Span Bridges (LSBs) for funding under PMGSY as follows: Up to 200 m in respect of Special Category States and LWE districts identified by the MHA. Upto 150 m in respect of other States.

Whether Compensation For Land Acquisition Is Paid In The Program?

The rural road is a State subject and it is the responsibility of State Government/ District Panchayat to ensure the availability of land for construction of road works under the programme. In view of the common benefit, generally, the land for construction of roads under PMGSY is made available by the villagers/Panchayat free of cost through voluntary donation. However, in rare cases, if the land is acquired for construction of roads under PMGSY, the State Government is required to pay compensation.

If Defects Are Noticed After Completion Of The Road, How Are They Rectified?

As per provisions of the contract, the contractor is liable for any defect that may occur until 5 years after completion of the road work. To enforce liability of defects, the security amount is deducted from the bills of the contractors. The contractor has to rectify the defect in the above period and if the rectification has not been carried out, the Project Implementation Unit (PIU) is required to rectify the defect and recover the cost from the security deposit of the contractor.

Is There A Provision For The Display Of Project-Related Information At Project Sites?

Citizen Information Board in the local language containing the following detailed information of work is provided on each work:- Description of every layer of work. Description of the quantity of material involved in work. How the road will be built and description. General information board containing information about executing agency, contractor, estimated cost of work and time for completion is also provided on every worksite.

Source:

https://pmgsy.nic.in/sites/default/files/pdf/PMGSY_Guidelines_Final.pdf